Farasi Energy Limited

Supply of Distribution Board ABB

Client | Location: Mega Pipes Solution Limited (HDPE Pipe Industry)
Location – Kisarawe II
Year: 2022 / 2023

Project description

This project involved the Supply of 12 Way , 8 Way , 6 Way ABB Distribution Boards for Mega Pipes Solution Limited ( HDPE Pipes Industry) – Kisarawe II

Scope of Supply

Supply of Type-Tested ABB Distribution Panels IEC 61439 , IEC 61439-1 & 3 Internal Arc Tested to IEC standards IEC 61641